Mercury Control

IAC’s 3 Step Program

Demonstration

1

IAC`s fully equipped, 48` long test rig trailer complete with recordation equipment, blower injection system, and bulk bag unloader will come to your site and install temporary sorbent injection wands for a full scale efficiency test.

Select PAC Sorbent

2

Several different sorbent`s can be checked for efficiency. Dispusion modeling into the process gas stream with documented removal effectiveness is tested and recorded.

Install PAC Equipment

3

Once the proper injection points and sorbent is selected for maximum efficiency, permanent equipment can be designed and installed. IAC can provide a “turnkey solution”.

We Provide

  • The testing trailer
  • Nozzles and manifolds
  • Introductive PLC controls for sorbent usage documentation
  • Labor for installation
  • Technical staff
  • Documentation of project results

IAC’s Field Testing Program

Using IAC technology and protocol our crew develops a test plan utilizing proprietary IAC sorbents and one or more activated carbon sorbents of your choosing. CFD Modeling is used to create a dispersion model and best locations for sorbent injection ports.

We will Provide

  • Test Rig – Totally self-contained injection system to store, inject and control the testing of multiple sorbent trials.
  • PLC Controls for this testing equipment.
  • IAC manpower provided for continuous 24-hour testing.
  • Installation of sorbet injection lines from test rig to ductwork.
  • Fabrication and installation of required nozzles, manifolds, and multiple injection ports into the duct test zone.
  • Coordination of test procedures and data acquisition with testing laboratory technicians.
  • Assistance in documenting performance data.